What are the main contents of the operating rules of the crane
(1) Before starting the Vohoboo crane, it is necessary to carry out the necessary inspections, and check its various parts, including the operating mechanism, control system, brakes and safety protection devices. If there is a problem, it should be dealt with in a timely manner.
(2) Before lifting the Vohoboo crane, it is necessary to adjust the position of the upper and lower limit stop blocks, and whether the fasteners are tightened. If it is abnormal, it cannot be lifted.
(3) During the lifting process, if it is found that the wire rope is deformed or corroded, or if it is severely worn, then the operation should be stopped immediately to avoid accidents or danger.
(4) Whether each braking device, limit switch, etc. is sensitive and reliable, how the wire rope is worn, and whether it needs to be replaced.
(5) Whether the running mechanism and transmission parts are operating normally and whether their lubrication is good.
(6) When Vohoboo crane starts to work, the operator cannot leave without permission.
(7) When a large crane is lifting a heavy object, it should not be overloaded, which will seriously damage the equipment.