Understand the installation steps of CDMD hoist and improve the safety of equipment use.

28-05-2020

For crane operation, the installation of CDMD hoist is the top priority. If the installation is incomplete or the safety measures are incomplete, it will not only reduce the later cargo transportation, but also cannot guarantee Safety matters at the place of operation. In view of this situation, it is necessary for equipment installers to understand the CDMD hoist installation steps.

Installation step 1: test machine

Before installation, basic safety work must be done, such as the quality inspection of the steel wire rope on the crane track. The steel wire rope plays a connecting role in the overall freight transportation. If the steel wire rope has insufficient load-bearing capacity, the consequences will be unimaginable; Only then can the test machine work be carried out to ensure that the crane is working properly;

Installation Step 2: Check the limit bracket

After passing the preliminary test machine, the next step is to check the limit frame. The check of the limit frame is mainly to see whether the steel wire rope is in direct contact with it. It should be known that once the steel wire rope and the limit frame contact each other, the equipment will be in operation. The wire rope and the limit frame are intertwined with each other, which will not only cause the cargo transportation to stop in mid-air, but also directly cause the limit frame to fail, and the operator cannot control it through the fiber switch;

Installation Step 3: Determine the direction of rotation

When installing the CDMD hoist, you also need to determine the direction of the hoist rotation. It should be noted that the hoist body cannot rotate along the crane's mounting rod. Once it is, it will increase the friction between the two and cause the mounting rod to be damaged. ;

Installation step four: confirm the installation of power supply

The simpler it is, the more it will be forgotten in the installation. For example, the standard configuration of the CDMD hoist power supply will often make mistakes. In many cases, the installer does not check the power configuration and does not connect according to the standard power supply;

The above-mentioned points are the main steps involved in the CDMD hoist installation process. I hope that through this article, you can improve the installation capacity, reduce the hoist and crane installation accidents, and thus improve the safety of the equipment in the later use.