Severity of cantilever crane operation
The event or hidden danger of the cantilever crane comes from unsafe reasons such as design, production, installation, operation and maintenance, to prevent the outbreak of the incident, and to a certain extent, it is in charge of the cause, especially to strengthen the production and installation And operation managers, requesting the operating company to use a company with production qualifications, processing cantilever cranes, recognized companies with the ability to install cantilever cranes including educated operators, crane operators to the job is to be unsafe from the start Outbreaks and aggravations of causes. Yes, to prevent the above unsafe reasons, the most important thing is to implement the guidelines carefully
And regulations, the establishment and careful implementation of rules and regulations, the implementation of irregular inspection and production, installation and operation of the company's attention. Let the staff of the production, installation and operation of the company have a heavy sense of responsibility and precaution. Only in this way can we avoid or avoid dangerous incidents.
The management approach to the use of cantilever cranes is the central structure undertaken by the operating company, including the precise supply and inspection of latent construction sites, operators for cantilever crane operators, cranes and other operators, as well as the implementation of protective measures to hide dangers from employees around the cantilever crane. Nursing, etc.
Inspection Guideline of Cantilever Crane
(1) Accurate supply and inspection of latent construction sites.
The base of the cantilever crane at the construction site is usually a constant reinforced concrete frame. The basic drawings are provided by the cantilever crane manufacturer after the entire anti-tipping stability and ground pressure resistance are corrected. The drawings determine the number of reinforcements, model specifications and Lower requirements for embedded foundation tower body or anchor bolt depth. The operating company should carefully control according to the ground pressure conditions and the technical drawings provided by the manufacturer to ensure the pouring quality of the foundation, prevent the foundation from subsiding after the operation of the cantilever crane, and allow the cantilever crane to reach the critical state of overturning, and the stability will be destroyed, and the The whole machine capsized.