Electric hoist construction material preparation and working conditions confirmation

10-08-2020

The electric hoist needs to prepare all materials before construction, and confirm whether the operating conditions and environment meet the relevant requirements, and normal construction can be carried out after confirming that it is correct.

Construction equipment and material preparation: The main construction materials required for installation include: lithium-based grease, molybdenum disulfide, cotton cloth, sandpaper, gauze, markers, etc.; main tools and tools: lifting hoist, copper rod, hand hammer , Stay wrench, Torx wrench, etc. Main measuring tools: level, level, steel ruler, right angle steel ruler, steel tape measure, vernier caliper. The construction machinery and tools should be firm and reliable, and the measuring tools should have inspection certificates within the validity period.

Confirmation of operating conditions of electric hoist: the construction site is level, the construction water, electricity, and gas meet the conditions of use; the trial operation site has reliable lighting, communication and fire-fighting facilities, and the fire-fighting channel is unobstructed; the construction site where the equipment is installed is similar to other systems under construction. Reliable isolation or isolation; there are storage places for parts, machine tool construction materials, etc., and corresponding protection measures such as rain, wind, and frost. The qualified parts and components that cannot be installed temporarily should be put into the warehouse for safekeeping; the main civil works related to the installation of the electric hoist are completed, and the lightning protection and grounding are perfect.

electric hoist

Get the latest price? We'll respond as soon as possible(within 12 hours)